Why South Carolina rejected Duke Energy’s preferred plant-construction plan

The plan adopted by the S.C. Public Service Commission would allow Duke Energy to continue to operate some coal plants through 2035, rather than 2030 as the Charlotte-based utility proposed.

share:

more energy news

Send Us A Message